Precision finish carpentry & architectural millwork installationServing Austin & Central Texas
Featured architectural work at the Niles project.

Austin, Texas · Est. 2015

Precision work.
Built to belong.

We install architectural millwork, finish carpentry, and specialty details for builders, architects, and designers. From the first layout to the final adjustment, we work through the details with your team.

Niles Featured Work01 / 05

Built for collaboration

Working with architects, designers, and builders to get the details right.

BuildersArchitectsInterior designersDiscerning homeowners
01Architectural Millwork Installation02Trim Carpentry03Fine Hardware04Casework Installation

Capabilities

The work we do.

Our experience across these trades helps us work through the details with your team and keep installation moving.

01

MEP Elevation & RCP Layout

We use MEP elevations and reflected ceiling plans to lay out fixtures, devices, grilles, access points, and finish lines in the field before installation begins.

Best engaged · Before rough-in
02

Door & Window Installation

We install doors and windows plumb and level, check their operation, and keep reveals consistent. We also prepare for hardware and coordinate with the surrounding finish work.

Best engaged · Pre-install coordination
03

Architectural Millwork Installation

We review shop drawings and install custom millwork, coordinating how it meets walls, floors, ceilings, stone, metal, glass, and other finishes.

Best engaged · Shop drawing review
04

Cabinet Installation

We lay out and install cabinetry with consistent reveals and careful alignment. We coordinate the installation with countertops, appliances, lighting, hardware, and finished surfaces.

Best engaged · Before countertops
05

Specialty Installation

We plan and install unusual materials, one-off assemblies, and complex shapes, protecting the work and resolving details in the field.

Best engaged · Before fabrication
06

Hardware & Punch Lists

We install and adjust fine hardware, finish the remaining details, and work through punch lists.

Best engaged · Through project closeout
Curved copper bay assembled through coordinated framing, substrate, and finished metal detailing.

Field coordination

Where the trades meet.

We coordinate millwork with stone, metal, glass, hardware, and surrounding finishes. With the builder and other trades, we confirm how the materials meet and the order of installation before work begins.

Builder coordinationArchitectural intentDesign alignmentTrade sequencing

The Kerr process

From layout to final adjustment.

Review the drawings, confirm the layout, and follow the installation through final adjustments.

01

Read the room

Before we begin, we review the drawings, scope, site access, other trades, and the finish you’re looking for.

02

Resolve the detail

We confirm the layout, how materials meet, and the order of work while there’s still time to make adjustments.

03

Install with care

We keep reveals consistent, protect finished surfaces, and stay in touch with the other trades as we install.

04

Close it cleanly

We make the final adjustments and complete the punch work before wrapping up.

Project gallery

Look closer.

Explore finished spaces, close-up details, and work in progress.

Project inquiries

Bring Kerr in early.

Tell us the location, scope, project stage, and timing. Drawings or site photos help us understand the work.

Tell us about your project.

Send your drawings, project location, timing, and installation needs. We will follow up to discuss the details.

The email button opens your email app. You can also write directly to brady@kerrconstruction.biz.